Here’s a small selection of some current and previous projects…
Project: Vue Cinema – Nijmegen – Netherlands
Client: Vue
Main Contractor: GF Holding
Duration: 10 weeks
Value: £190,000.00
Works Involved:
- Jumbo Metal Stud Fire Rated Partitions
- Standard Metal Stud Partitions
- Mf Ceilings
- Projector Pods
- Suspended Ceilings
- Plastering
Client: Fulham F.C
Main Contractor: Buckingham Group
Duration:
Value: £700,000.00
Works Involved:
- Design of partition walls
- Jumbo Metal Stud Fire Rated Partitions
- Standard Metal Stud Partitions
- Mf Ceilings
- SFS
Bespoke Risers
Insulation to Underside of concrete terrace
Project: Greenacres – Porthmadog
Client: Haven
Main Contractor: GF Holding
Duration: 12 weeks
Value: £200,000.00
Works Involved:
- Jumbo Metal Stud Fire Rated Partitions
- Standard Metal Stud Partitions
- Mf Ceilings
- Bulkhead Details
- Joinery Works
Client: Haven
Main Contractor: GF Holding
Duration:
Value:
Works Involved:
- Jumbo Metal Stud Fire Rated Partitions
- Standard Metal Stud Partitions
- Mf Ceilings
- Bulkhead Details
- Timber Stud Partitions
- Timber Pagoda
- Joinery Works
Client: Everyman Cinemas
Main Contractor: GF Holding
Duration: 24 weeks
Value:
Works Involved:
- Metal Stud Acoustic Partitions
- Fire-Rated Steel Encasements
- Curved Metal and Stud Partitions
- Metal and Stud standard Partitions
- Two Coat Traditional Plaster
- Bulkhead Works
Client: Archlight Cinemas
Main Contractor: GF Holding
Duration: 12 weeks
Value: £180,000
Works Involved:
- Metal stud acoustic partitions
- Acoustic board and plywood to steel arched framing
- Fire rated curved bulkheads
- Two coat traditional plaster
Client: Kings College
Main Contractor: Paragon Interiors
Duration: 16 Weeks
Value: £200,000
Works Involved:
- Metal stud partition walls
- Two coat traditional plaster
- MF suspended ceilings
- Mineral fibre suspended ceilings
- Sloping bulkhead details
- External render works
- Fire-rated column encasements
Project: UPS Hub – New Distribution Centre, London Gateway, Essex
Client: UPS
Main Contractor: Buckingham Group Contracting Ltd
Duration: 12 Weeks
Value: £500,000
Our Works: This live project involves full fit out of four Office Blocks / Entrance Building / Automotive Centre and Security Gatehouse.
- Acoustic metal stud partitions
- Internal EWL Insulated Systems
- MF suspended ceilings
- Metal tile, concealed suspended ceilings
- Insulated plasterboard wall linings
- Shaft-Walling systems
Project: Leicester Tigers – New Clubhouse Stand
Client: Leicester Tigers RFC
Main Contractor: Buckingham Group Contracting Ltd
Duration: 8 Weeks
Value: £300,000
Our Works: Recently completed full fit-out on the three-storey building, which includes club offices, match-day ticket office, the premium VIP clubhouse season ticket lounge, a Tigers match-day retail shop, stadium big screen, a super box, as well as a concourse area that will house Tigers heritage, food kiosks and public bars.
- Acoustic metal stud partitions
- EWL Systems
- MF ceilings / Mineral fibre tile and grid suspended ceilings
- Feature floating ceilings and bulkheads
- Insulated plasterboard wall linings
- Shaft-Walling systems
- Fire column surrounds
- External colour-through render
Project: Phoenix Parkway Care Village, Scunthorpe
Client: Prime Life
Main Contractor: G.S Kelsey
Duration: 16 Weeks
Value: £300,000
Our Works: This completed project involved plastering works to a new 36 Bed care facility in Scunthorpe:
- Metal stud partition walls
- Two coat traditional plaster
- MF suspended ceilings
- Mineral fibre suspended ceilings
- Acoustic Ceilings
- Feature floating ceilings and bulkheads
- Vaulted ceilings
- Floor Screeding
- External colour-through render
Project: Spar Petrol Station, Louth
Main Contractor: G.S Kelsey
Duration: 6 weeks
Our Works:
Large Fire Dividing Unit Walls
- Acoustic Metal stud partition walls
- Two coat traditional plaster
- MF suspended ceilings
- Mineral fibre suspended ceilings
- Fire column surrounds
- Floor Screeding
- Ceramic Tiling to walls and floors
Project: 12 luxury apartments; Scunthorpe
Client: Private Client
Main Contractor: G.S Kelsey
Duration: TBC
Value: £TBC
Our Works: This on-going £2 million project to convert the derelict site of the former Majestic Cinema and an adjoining vacant office in Scunthorpe into 12 luxury apartments.
- Acoustic Metal stud partition walls
- Two coat traditional plaster
- MF suspended ceilings
- Mineral fibre suspended ceilings
- Fire column surrounds
Project: 20 21 Visual Arts Centre, Scunthorpe
Client: North Lincolnshire Council
Main Contractor: G.S Kelsey
Duration: 4 weeks
Our Works:
- Acoustic Metal stud partition walls
- Two coat traditional plaster
- MF suspended ceilings
- Mineral fibre suspended ceilings
- Fire column surrounds
- Floor Screeding
- Ceramic Tiling to walls and floors