Here’s a small selection of some current and previous projects…

Project: Vue Cinema – Nijmegen – Netherlands

Client: Vue

Main Contractor: GF Holding

Duration: 10 weeks

Value: £190,000.00

Works Involved:

  • Jumbo Metal Stud Fire Rated Partitions
  • Standard Metal Stud Partitions
  • Mf Ceilings
  • Projector Pods
  • Suspended Ceilings
  • Plastering
Project: New Riverside Stand / Putney Stand

Client: Fulham F.C

Main Contractor: Buckingham Group

Duration:

Value: £700,000.00

Works Involved:

  • Design of partition walls
  • Jumbo Metal Stud Fire Rated Partitions
  • Standard Metal Stud Partitions
  • Mf Ceilings
  • SFS

Bespoke Risers

Insulation to Underside of concrete terrace

Project: Greenacres – Porthmadog

Client: Haven

Main Contractor: GF Holding

Duration: 12 weeks

Value: £200,000.00

Works Involved:

  • Jumbo Metal Stud Fire Rated Partitions
  • Standard Metal Stud Partitions
  • Mf Ceilings
  • Bulkhead Details
  • Joinery Works
Project: Craig Tara

Client: Haven

Main Contractor: GF Holding

Duration:

Value:

Works Involved:

  • Jumbo Metal Stud Fire Rated Partitions
  • Standard Metal Stud Partitions
  • Mf Ceilings
  • Bulkhead Details
  • Timber Stud Partitions
  • Timber Pagoda
  • Joinery Works
Project: Crystal Palace Everyman Cinema

Client: Everyman Cinemas

Main Contractor: GF Holding

Duration: 24 weeks

Value:

Works Involved:

  • Metal Stud Acoustic Partitions
  • Fire-Rated Steel Encasements
  • Curved Metal and Stud Partitions
  • Metal and Stud standard Partitions
  • Two Coat Traditional Plaster
  • Bulkhead Works
Project: Battersea Power Station Archlight Cinema

Client: Archlight Cinemas

Main Contractor: GF Holding

Duration: 12 weeks

Value: £180,000

Works Involved:

  • Metal stud acoustic partitions
  • Acoustic board and plywood to steel arched framing
  • Fire rated curved bulkheads
  • Two coat traditional plaster
Project: Kings College London

Client: Kings College

Main Contractor: Paragon Interiors

Duration: 16 Weeks

Value: £200,000

Works Involved:

  • Metal stud partition walls
  • Two coat traditional plaster
  • MF suspended ceilings
  • Mineral fibre suspended ceilings
  • Sloping bulkhead details
  • External render works
  • Fire-rated column encasements

Project: UPS Hub – New Distribution Centre, London Gateway, Essex

Client: UPS

Main Contractor: Buckingham Group Contracting Ltd

Duration: 12 Weeks

Value: £500,000

Our Works: This live project involves full fit out of four Office Blocks / Entrance Building / Automotive Centre and Security Gatehouse.

  • Acoustic metal stud partitions
  • Internal EWL Insulated Systems
  • MF suspended ceilings
  • Metal tile, concealed suspended ceilings
  • Insulated plasterboard wall linings
  • Shaft-Walling systems

Project: Leicester Tigers – New Clubhouse Stand

Client: Leicester Tigers RFC

Main Contractor: Buckingham Group Contracting Ltd

Duration: 8 Weeks

Value: £300,000

Our Works: Recently completed full fit-out on the three-storey building, which includes club offices, match-day ticket office, the premium VIP clubhouse season ticket lounge, a Tigers match-day retail shop, stadium big screen, a super box, as well as a concourse area that will house Tigers heritage, food kiosks and public bars.

  • Acoustic metal stud partitions
  • EWL Systems
  • MF ceilings / Mineral fibre tile and grid suspended ceilings
  • Feature floating ceilings and bulkheads
  • Insulated plasterboard wall linings
  • Shaft-Walling systems
  • Fire column surrounds
  • External colour-through render

Project: Phoenix Parkway Care Village, Scunthorpe

Client: Prime Life

Main Contractor: G.S Kelsey

Duration: 16 Weeks

Value: £300,000

Our Works: This completed project involved plastering works to a new 36 Bed care facility in Scunthorpe:

  • Metal stud partition walls
  • Two coat traditional plaster
  • MF suspended ceilings
  • Mineral fibre suspended ceilings
  • Acoustic Ceilings
  • Feature floating ceilings and bulkheads
  • Vaulted ceilings
  • Floor Screeding
  • External colour-through render

Project: Spar Petrol Station, Louth

Main Contractor: G.S Kelsey

Duration: 6 weeks

Our Works:
Large Fire Dividing Unit Walls

  • Acoustic Metal stud partition walls
  • Two coat traditional plaster
  • MF suspended ceilings
  • Mineral fibre suspended ceilings
  • Fire column surrounds
  • Floor Screeding
  • Ceramic Tiling to walls and floors

Project: 12 luxury apartments; Scunthorpe

Client: Private Client

Main Contractor: G.S Kelsey

Duration: TBC

Value: £TBC

Our Works: This on-going £2 million project to convert the derelict site of the former Majestic Cinema and an adjoining vacant office in Scunthorpe into 12 luxury apartments.

  • Acoustic Metal stud partition walls
  • Two coat traditional plaster
  • MF suspended ceilings
  • Mineral fibre suspended ceilings
  • Fire column surrounds

Project: 20 21 Visual Arts Centre, Scunthorpe

Client: North Lincolnshire Council

Main Contractor: G.S Kelsey

Duration: 4 weeks

Our Works:

  • Acoustic Metal stud partition walls
  • Two coat traditional plaster
  • MF suspended ceilings
  • Mineral fibre suspended ceilings
  • Fire column surrounds
  • Floor Screeding
  • Ceramic Tiling to walls and floors